Conkt verifies large-load interconnection applications against real utility, NEC, and IEEE standards — before they reach the utility. We catch the deficiencies that trigger multi-year restudy cycles.
No pitch — a 20-minute conversation to understand how this works on your side.
Transformer impedance on Sheet E-3 (6.75%) does not match the fault current calculation on Sheet E-7 (7.2%).
NEC 705.12(B)(2)(3)(a)Protective relay coordination study not included for the proposed interconnection point.
IEEE 1547-2018 §6.5.1Point-of-interconnection coordinates match the application form.
Utility Interconnection Manual §2.1Every deficiency notice sends your application back to the end of a process measured in years, not weeks.
U.S. grid interconnection backlog as of 2026 — capacity waiting in queue.
Average time projects spent in the PJM interconnection queue before reaching commercial operation.
2026 hyperscaler infrastructure capex that depends on getting large loads connected.
Most interconnection tooling is built to help utilities process the queue. Conkt works on your side of the submission.
Existing automation helps grid operators triage and study the applications already sitting in their queue. Useful — but it happens after your submission is already in, and after a deficiency has already cost you time.
We check your application against your utility's technical requirements, the NEC, and IEEE 1547 while you can still fix what's wrong — turning a months-long restudy cycle into an afternoon of corrections.
A real reasoning pipeline — not a checklist, and not an unreviewed AI guess.
You describe the project — utility, load, voltage class, point of interconnection.
We extract structured requirements from your one-lines, load data, and equipment specs.
Those requirements are checked against the standards that actually apply to your project.
You get cited findings — Pass, Fail, Needs Review, or Unknown — each traceable to a specific standard.
Every finding is reviewed by a qualified engineer before you see it. Our findings are a decision-support input for your team's review — not a certification, and Conkt is not the engineer of record on your submission.
Teams preparing large-load interconnection applications where a restudy cycle is measured in quarters.
We're working with a small number of lighthouse partners. No pitch — a 20-minute conversation to understand where your applications actually run into friction.
We'll never share your project details. Conversations are confidential.